Loading...

Pre Requirements

Pre-Requirements

Pre-Requirements

Navyug Udyog is a prominent Manufacturer, Exporter, Trader and Supplier of Scientific Equipment, Laboratory & Pathological Equipments, Hospital Equipment, Diary Equipment, Pharmaceutical Equipment, etc. .

DescriptionRequired for Installation
Surrounding 
AreaClean & free from dust
Temp20°C ~ 35°C (Recommended using AC)
LevelHorizontally leveled
Clearance Spacexcz
Right & Left SideMinimum 500mm
Back SideMinimum 500mm
Top SideMinimum 500mm
Door Open AreaGreater than door's width size of equipment
Stability Door Entrance DoorRoom door opening area should be greater than equipment size
Split Type Refrigeration Unit (compressor unit) 
DistanceDistance between equipment and compressor unit should not exceed 45 feet
Hole Requirement3"" diameter hole required at wall for passing copper pipe of split type refrigeration unit
ShadeProper shade is required to protect compressor unit from rain water
Required Stabilized Power Supply for Equipment 
For Non Walk-in TypeSingle phase, 230±10 VAC, 50 Hz, 20 Amp
For Walk-in TypeThree phase, 440±10 VAC, 50 Hz, 32 Amp
Proper EarthingMust
Cable Specification 
For Non Walk-in Type3 Core
For Walk-in Type4 Core
Metal Clad Socket with MCB 
For Non Walk-in Type25 Amp
For Walk-in Type32 Amp / 63 Amp
Required UPS for PLC & Control SystemSingle phase, 230±10 VAC, 50 Hz, 250 VA
Required Stabilized Power Supply for Calibrator & PrinterSingle phase, 230±10 VAC, 50 Hz, 5 Amp

Recommended Servo Voltage stabilizer

Distance between copper pipe of compressor unit & equipment should not exceed 45 feet